Open Access
E3S Web of Conferences
Volume 3, 2014
Emerging Technology for Sustainable Development Congress (ETSDC 2014)
Article Number 01027
Number of page(s) 8
Published online 14 August 2014
  1. Aibinu, A.A., G.O.Jagboro, 2002. The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20 (8): 593-599 [CrossRef]
  2. Chauhan, K.A., N.C.Shah, V.R.Venkata, 2008. The Analytic Hierarchy Process as a Decision- Support System in the Housing Sector: A Case Study. World Applied Sciences Journal, 3: 609-613.
  3. Annamoradnejad, R., A.Zarabi, 2011. The Qualitative and Quantitative Changes of Housing in Iran (1966-2006). World Applied Sciences Journal, 15: 350-358.
  4. Abu Bakar, A.H., A.K.Nurkhuraishah, M.N.Yusof, C.H.Pin, 2012. The Necessity of the Project Manager in Housing Development: Case Studies in Penang, Malaysia, World Applied Sciences Journal, 16 (10): 1462-1472
  5. Heldman, K., V.Mangano, 2009. PMP Project Management Professional Exam Review Guide. John Wiley and Sons.
  6. Salehi, M., 2009. Application of Fuzzy TOPSIS Technique for Evaluation of Project. World Applied Sciences Journal, 6 (6): 776-783
  7. Soleimanzadeh, S., M.A.Othuman Mydin, 2013. Influence of High Temperatures on Flexural Strength of Foamed Concrete Containing Fly Ash and Polypropylene Fiber, International Journal of Engineering, 26 (1): 365-374. [CrossRef]
  8. Fahimifard, S.M., A.A.Kehkha, 2009. Application of Project Scheduling in Agriculture (Case Study: Grape Garden Stabilization). American-Eurasian J. Agric. & Environ. Sci., 5 (3): 313-321
  9. Bolotin, S., A.Birjukov, 2013. Time Management in Drafting Probability Schedules for Construction Work. World Applied Sciences Journal 23: 1-4
  10. Othuman Mydin, M.A., 2011. Thin-walled steel enclosed lightweight foamed concrete: A novel approach to fabricate sandwich composite. Australian Journal of Basic and Applied Sciences, 5 (12): 1727-1733