Geomechanical Substantiation of the Parameters of Injection Fixing of the Soil Bases During the Liquidation of the Emergency Condition of the Structure
1
T.F. Gorbachev Kuzbass State Technical University,
650000 Vesennyaya st. 28,
Kemerovo,
Russia
2
OJSC «SUEK-Kuzbass»,
652507 Vasilyeva street 1,
Leninsk-Kuznetsky,
Russia
* Corresponding author: psm.tigm@kuzstu.ru
The emergency condition of a structure that is complex in plan of and located in the mine development zone. As a result of a complex of engineering-geological and geophysical surveys it was established that the cause of significant deformations of the foundations of the structure are the zones of weakened and water-saturated grounds at the base of the foundations, formed due to changes in the hydrogeological regime and man-made accidents. The technique of substantiation of technological parameters of the injection method to soil consolidation is described, including computer modeling, forecasting of deformations of the naturaland fixing massif, analysis of the stress-strain state of soils in the most dangerous area. The effectiveness of the adopted scheme of injecting reinforcement was confirmed according to the approved methodology for liquidation of an emergency condition of a mining structure. It is proposed to create additional fixed zones within the formed zone.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.