Issue |
E3S Web Conf.
Volume 49, 2018
SOLINA 2018 - VII Conference SOLINA Sustainable Development: Architecture - Building Construction - Environmental Engineering and Protection Innovative Energy-Efficient Technologies - Utilization of Renewable Energy Sources
|
|
---|---|---|
Article Number | 00103 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/e3sconf/20184900103 | |
Published online | 13 August 2018 |
Concrete production - an application of OC curves in conformity control
Rzeszow University of Technology, Powstancow Warszawy 12, 35-082 Rzeszow, Poland
* Corresponding author: izas@prz.edu.pl
The decision on conformity or non-compliance of strength is made on the basis of a comparison of the results of testing of the mean value and minimum value of the compressive strength of concrete with the compliance criterion. This decision is made on the basis of the adopted statistical quality control plan. The quality monitoring of concrete has to be carried out throughout its production process. There are various techniques for the monitoring of quality concrete, namely Control charts: Cusum, Schewart and EWMA Control charts or operational-characteristic (OC) curve and average outgoing quality curve. In the case of concrete quality control, it may be an OC curve of a random sampling plan according to a numerical value or alternative evaluation, or an OC curve of the operational rule for testing concrete strength. The paper presents an analysis and assessment of the risk associated with making the second type of error related to compressive strength of concrete. For analysis, the OC curve of the operational rule for testing concrete strength, with OC curve of the second type of error was used as a function of the actual average compressive strength of the concrete.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.