Issue |
E3S Web Conf.
Volume 56, 2018
VII International Scientific Conference “Problems of Complex Development of Georesources” (PCDG 2018)
|
|
---|---|---|
Article Number | 04022 | |
Number of page(s) | 7 | |
Section | Strategic, Geo-Environmental and Economic Problems of Subsurface Use | |
DOI | https://doi.org/10.1051/e3sconf/20185604022 | |
Published online | 26 September 2018 |
Ecology and mining industry development in high-mountain areas (the Inner Tien Shan)
National Academy of Sciences, Institute of Geomechanics and subsoil development, 720055 Bishkek, Kyrgyz Republic
* Corresponding author: geofizika@list.ru
The genesis and transformation in time of risks in the areas of high altitude tailings storage facilities with respect to changing climate are considered. Based on the example of the Kumtor mine in the center of the Tien Shan at a height of 3600-4300 m, three groups of risk factors were allocated concerning a large, ecologically hazardous facility - the tailings dam containing cyanide waste. For one of the factors, calculations of an accidental dam burst were made using the Fault Tree Analysis (FTA) method. It was concluded that the construction of large-scaled and geoenvironmentally hazardous facilities in less researched high-mountain areas has to be be drawn upon detailed and permanent monitoring of the facility itself and its environment. It is crucial to be prepared for operational adjustment of projects and an immediate rehabilitation of constructed facilities.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.