Issue |
E3S Web Conf.
Volume 105, 2019
IVth International Innovative Mining Symposium
|
|
---|---|---|
Article Number | 01016 | |
Number of page(s) | 5 | |
Section | Environment Saving Mining Technologies | |
DOI | https://doi.org/10.1051/e3sconf/201910501016 | |
Published online | 21 June 2019 |
Determination of the Parameters of Technological Schemes for the Development of Coal Seams Prone to Spontaneous Combustion using Computer Simulation
JSC SUEK Kuzbass, 652507, 1, Vasilyev St., Leninsk-Kuznetsky, Russia
The study considers thr problem of endogenous fire hazard in underground mining of coal seams prone to spontaneous combustion. The main trends in the development of modern technology of underground coal mining are shown. The interaction of air-gas-dynamic and geomechanical processes in the development of coal seams by longwall mining is considered. The possibilities of computer simulation of air-gas-dynamic processes in the extraction districts of modern coal mines are considered. The significant influence of geological and mining conditions of mining operations on the distribution of air flow in extraction districts and the efficiency of gas emission control in the workings of the extraction districts are shown. The design scheme and the results of numerical studies (methane and oxygen concentration fields) are given. It is concluded that it is necessary to determine the rational parameters of the preparation, ventilation, isolated drainage and degassing schemes when developing gas-bearing coal seams that are prone to spontaneous combustion. Recommendations are given on improvement of the safety in mining coal seams that are prone to spontaneous combustion.
© The Authors, published by EDP Sciences, 2019
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.