Application of BIM technology in operation of port marine structures
Admiral Makarov State University of Maritime and Inland Shipping, Dvinskaya 5/7, St. Petersburg, 198035, Russia
* Corresponding author: olhovikeo@gumrf.ru
The features of the BIM model development for marine port facilities operation are discussed. Infrastructure objects differ significantly from linear and area objects, the use of information modeling for transport infrastructure requires a new approach to organization of design, construction and especially for operation. Most seaports were built long ago and there is not to have the project documentation for them. It is therefore very relevant is the problem of adapting existing building and design documentation to develop models of operation. Infrastructure projects always have a large number of interconnections that are irregular and difficult to formalize into an information model. Port berthing facilities in an intensive mode interact with the courts, a water space, the cargo base and special cargo handling equipment. On the example of the design model of the seaport, we collected sufficient data for their further integration into the BIM model and the transfer of information in digital form for its repeated use at different stages of the life cycle of the seaport. The individual information schemes and elements for standardization of the design of offshore mooring structures, taking into account of turnover in object-oriented format with attribute data are offered. The model includes the necessary information on all parameters of operation of the berthing facility, planning of measures for emergency situations, standard calendar work plan, schedules for monitoring the technical condition, financial estimates for operational maintenance, repairs, etc. The activities on the automation of deformation monitoring system, calculation of structural strength of the main structural elements and control risks are additionally proposed. The transition to life-cycle contracts in the operation of marine berthing facilities is justified.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.