Life Cycle Cost Analysis and Optimization of Modular Substation
1 State Grid Anhui Electric Power Co., Ltd. Construction Company, Hefei, Anhui, 230071, P.R. China ;
2 Anhui Jianzhu University, BIM Engineering Center of Anhui Province, Hefei, Anhui, 230601, P.R. China ;
Due to the lack of high standardization and specialization, the production scale of modular substation is difficult to meet the established requirements. Compared with traditional substation construction, there are still practical problems such as high production costs. Therefore, it is still difficult to promote modular substation. Considering the life cycle of modular substation project, Cost Breakdown Structure (CBS) and Engineering Breakdown Structure (EBS) of the modular substation were defined through literature reading and data analysis. Then use the life cycle cost mapping model to further determine the mapping relationship between CBS and EBS. Finally, the connotation and goal of the life cycle cost optimization of modular substation were proposed, which can effectively promote the cost management of modular substation projects and optimization.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.