Research on the Calculation Method of Navigable Effective Width of Two Bridges Near Layout
1 The traffic department of transportation Water Science Research Institute, Beijing 100088, China
2 Chongqing Southwest Waterway Engineering Scientific Research Institute, Chongqing Jiaotong University, Chongqing 400016, China
* Corresponding author's e-mail: liulei@wti.ac.cn
New-builtbridges andold bridges in inland waterwaysnear layout,the intersects angle that the normal direction of bridges axes andthe flow directionis more than 5, it is an important issuethat the navigable effective widthis determinedscientificallyand reasonably to ensure the safety of ships and bridge.In this paper, navigable effective clearance widthof two bridges as a wholeare calculated based on channel conditions and pier layout,which calculate the navigable effective width in the channel direction by oblique projection, determine the turbulence width by physical model test, graphicsand compare. Finally, taking the Lijiatuo Yangtze River secondbridge project in Chongqing as an example, the scientific and rationality of this method is verified, which can provide reference for the determination of navigable effective clearance widthof similar bridges in the future.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.