Issue |
E3S Web Conf.
Volume 91, 2019
Topical Problems of Architecture, Civil Engineering and Environmental Economics (TPACEE 2018)
|
|
---|---|---|
Article Number | 02036 | |
Number of page(s) | 7 | |
Section | Energy-Efficient Construction | |
DOI | https://doi.org/10.1051/e3sconf/20199102036 | |
Published online | 02 April 2019 |
Organizational optimization of construction processes by virtue of robotization
1 Tyumen Industrial University, Volodarskogo str., 38, Tyumen, 625000, Russia
2 Moscow Aviation Institute, Volokolamskoe highway, 4, Moscow, 125993, Russia
3 Moscow State University of Civil Engineering, 129337, 26, Yaroslavskoe Shosse, Moscow, Russia
4 Moscow Region State University, Radio str., 10A, 105005, Moscow, Russia
* Corresponding author: a.copytowa@yandex.ru
The comparative analysis of two options for investment and construction projects, with partial robotization of production and traditional work organization was conducted on the criterion of time and cost minimizing the of construction. The use of two robot types was considered, a bricklayer and a plasterer robot. As a comparison result of main quantitative indicators of construction organization plan, it was found that the use of robots reduced the duration of construction, expenditures and labor costs. Lack of fatiguability, lunch breaks, smoke breaks, conversations, illnesses, as well as round-the-clock operation, the absence of malicious intents, no theft and, therefore, procedural violations, composition disorders, etc., allows to look at the introduction prospect of construction robots with optimism.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.