Issue |
E3S Web Conf.
Volume 91, 2019
Topical Problems of Architecture, Civil Engineering and Environmental Economics (TPACEE 2018)
|
|
---|---|---|
Article Number | 08001 | |
Number of page(s) | 5 | |
Section | Environmental Management and Environmental Economics | |
DOI | https://doi.org/10.1051/e3sconf/20199108001 | |
Published online | 02 April 2019 |
Statistical modeling of residential complex construction project
1 Peter the Great St. Petersburg Polytechnic University, 195251 St. Petersburg, Russia
2 Moscow State University of Civil Engineering, 26, Yaroslavskoye shosse, Moscow, 129337, Russia
* Corresponding author: morozovoff85@gmail.com
The article presents a statistical simulation of the deviation of the project duration from the planned value. Regression analysis was carried out - a method of statistical data processing that allows measuring the relationship between one or more causes (factor characteristics) and the consequence (effective characteristic). The end result is a curve and a correlation coefficient, which with a certain probability will allow us to predict the amount of pecuniary injury in this project.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.