Issue |
E3S Web Conf.
Volume 91, 2019
Topical Problems of Architecture, Civil Engineering and Environmental Economics (TPACEE 2018)
|
|
---|---|---|
Article Number | 08024 | |
Number of page(s) | 7 | |
Section | Environmental Management and Environmental Economics | |
DOI | https://doi.org/10.1051/e3sconf/20199108024 | |
Published online | 02 April 2019 |
The formation of engine parks of the construction organizations with accounting of energy efficiency and environmental friendliness
Vladimir State University named after Alexander and Nikolay Stoletovs, Gorky st. 87, 600000, Vladimir, Russia
* Corresponding author: oc204@bk.ru
Increase in energy efficiency of construction allows reducing costs of technical operation of parks of the equipment and increasing construction energy saving level in general. To achieve these goals, it is offered to apply modern methods of the organization and works, to use the hi-tech construction equipment, and also to form an optimum set of mechanization for construction and installation works. A criterion of optimization is the cost of work. In definition of performance data of the car at the enterprise, its energy efficiency is taken into account, the options are compared, and the optimal set of cars is formed. During the solution of the task, conclusions were formulated, showing that ecological planning and steering together with energy audit on the construction site allow more rational formation of parks of cars, improving ecological component and quality of construction works.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.