Issue |
E3S Web Conf.
Volume 91, 2019
Topical Problems of Architecture, Civil Engineering and Environmental Economics (TPACEE 2018)
|
|
---|---|---|
Article Number | 08028 | |
Number of page(s) | 8 | |
Section | Environmental Management and Environmental Economics | |
DOI | https://doi.org/10.1051/e3sconf/20199108028 | |
Published online | 02 April 2019 |
Reconstruction and modernization of industrial parks
Moscow State University of Civil Engineering, 26, Yaroslavskoye Shosse, Moscow, 109377, Russia
* Corresponding author: osun_kaf@mgsu.ru
The construction of the industrial park is organized in accordance with the program management method, which identifies independent startup industrial and construction complexes that determine the order in which preparatory and basic works are carried out, the calendar construction timeframe and the sequence for entering construction queues taking into account the timely supply of equipment and structures, regulatory requirements for material and labor resources, as well as means of mechanization. In the organizational form of reproduction, carried out during the reconstruction of the industrial real estate of the park, surveys are conducted on the technical condition of the structures, intrasurface and intrasite vehicles and communications, equipment and engineering networks, production conditions and construction and installation works. The article presents an example of assessing economic efficiency of the business plan for organizing the construction of an oil pipeline, which is part of an industrial (industrial) park, in the section from 1569 to 1978 km in the Mari Republic and the southern part of Kirov Oblast, with natural borders from r. Vyatka to r. Vetluga diameter of the pipeline is 1020 mm.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.