Issue |
E3S Web Conf.
Volume 144, 2020
The 2nd International Symposium on Water Resource and Environmental Management (WREM 2019)
|
|
---|---|---|
Article Number | 01012 | |
Number of page(s) | 7 | |
DOI | https://doi.org/10.1051/e3sconf/202014401012 | |
Published online | 27 January 2020 |
Gelo ethnicity water resources artistic design and utilization
1
Xi’an Jiaotong University. School of Human Settlements and Civil Engineering. 710049 No.28Xianning west Road. Beilin District. Xi’an, China
2
Chongqing University of Posts and Telecommunications. College of Media and Arts. 400065 No.2 Chongwen Road. Chongqing, China
* Corresponding author: 2377230006@qq.com
The artistic design and utilization of water resources have been in the field of the urban landscape for a long time, but the artistic design and utilization of rural water resources have hardly touched. Based on Gelo ethnicity religion, ecological collective unconscious, art, culture, traditional production, and living water, etc. on the basis of research conducted on the research of artistic design and enriched Gelo ethnicity superposition in the function of water resources utilization in additional value, based on this point, move Gelo ethnicity construction of modern ecological civilization leads the ecological economy and the development of national cultures.
Key words: Gelo ethnicity / water resources / artistic utilization
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.