Issue |
E3S Web Conf.
Volume 156, 2020
4th International Conference on Earthquake Engineering & Disaster Mitigation (ICEEDM 2019)
|
|
---|---|---|
Article Number | 05017 | |
Number of page(s) | 8 | |
Section | Structure | |
DOI | https://doi.org/10.1051/e3sconf/202015605017 | |
Published online | 13 March 2020 |
Rehabilitation and reconstruction of community housing post-West Nusa Tenggara Earthquake 2018 (A case of Lauk Rurung Timuk and Lauk Rurung Barat Sub-villages, Sembalun Bumbung, Sembalun, East Lombok)
Directorate of Bridge, Directorate General of Highway, Ministry of Public Works and Housing, Jl. Pattimura No. 20 Kebayoran Baru, South Jakarta 12110, Indonesia
* Corresponding author: choirulrama@gmail.com
Three strong earthquakes occurred and damaged the infrastructures and human settlements at some regions of West Nusa Tenggara Province in July and August 2018. This paper describes the policy and action taken by Ministry of Public Works and Housing (MPWH), Republic of Indonesia, to assist in the rehabilitation and reconstruction, specifically for the housing. The process started from early September 2018 by Civil Servant Candidate from MPWH together with the society. The action was comprised of three phases: socialization, design, and construction. Those phases are discussed in this paper along with their particular obstacles. The most critical phase is deducted. All the resources were gathered from the law applied in Indonesia, the official instruction of implementation, the technical instructions, interviews and volunteers’ point of views. This paper employed qualitative approach through observation, survey, group discussion, and interview to analyze factors that significantly affected the implementation of rehabilitation and reconstruction of houses by referring to the theory. The results of the study suggest that the socialization phase is found to be the most decisive.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.