Issue |
E3S Web Conf.
Volume 164, 2020
Topical Problems of Green Architecture, Civil and Environmental Engineering 2019 (TPACEE 2019)
|
|
---|---|---|
Article Number | 11018 | |
Number of page(s) | 6 | |
Section | Environmental Policy | |
DOI | https://doi.org/10.1051/e3sconf/202016411018 | |
Published online | 05 May 2020 |
Ensuring energy security in the context of the implementation of import substitution and innovative development policies
1 State University of Management, 99, Ryazan Avenue, Moscow, 109542, Russian Federation
2 Financial University under the Government of the Russian Federation, 49, Leningradsky avenue, Moscow, 125993, Russian Federation
3 The Technological University of Tajikistan, 63/3, N. Karaboev, Dushanbe, 734055, The Republic of Tajikistan
4 Russian University of Transport, 9b9, Obrazcova Street, Moscow, 127994, Russian Federation
* Corresponding author: 11117899@mail.ru
The study is aimed at studying energy security in the electricity sector and developing measures aimed at increasing the share of domestic innovative equipment. The paper analyzes indicators related to the amount of installed capacity, the output and commissioning of power equipment and the share of foreign equipment used. As a result of the analysis, an increase in equipment depreciation, a drop in the indicators of qualitative renewal of fixed assets, and a high share of foreign-made equipment were revealed. At the end of the study, measures were proposed that allow for a better policy in the field of import substitution and innovative development of the electric power complex.
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.