Issue |
E3S Web Conf.
Volume 168, 2020
II International Conference Essays of Mining Science and Practice
|
|
---|---|---|
Article Number | 00006 | |
Number of page(s) | 10 | |
DOI | https://doi.org/10.1051/e3sconf/202016800006 | |
Published online | 06 May 2020 |
Formulation of methods reducing landslide phenomena and the collapse of career slopes during open-pit mining
1
Satbayev University, 50013, Almaty, Satbayev Str., 22, Kazakhstan
2
Kazakh Leading Academy of Architecture and Civil Engineering, 50050, Almaty, Ryskulbekov Str., 28, Kazakhstan
* Corresponding author: is.yerkin@gmail.com
In this article, methods of reducing landslide phenomena and collapse of career of slopes, in the extraction of minerals with the open-pit mining approach are set out. The ways of uncovering upper argillaceous acclivities with the creation of buttresses made from rocky minerals are suggested. Also, technological frameworks of the establishment of acclivities of benches in primary resources, with preliminary conduct of the research on the deformation of the minerals from the drilling-andblasting activities are offered. On the basis of the dynamic processes of blasting and resistance of the massif to the breakage, there is a formula offered, for determining the rate of fracturing, and the methodology of calculation of the specific charge of the blasting substance, including and excluding the fracturing of the massif is substantiated. The technique of defining the parameters of buttresses, used in strengthening of the acclivities, piled with unstable argillaceous and friable minerals, is also suggested.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.