Issue |
E3S Web Conf.
Volume 174, 2020
Vth International Innovative Mining Symposium
|
|
---|---|---|
Article Number | 01059 | |
Number of page(s) | 10 | |
Section | Environment Saving Mining Technologies | |
DOI | https://doi.org/10.1051/e3sconf/202017401059 | |
Published online | 18 June 2020 |
Improving the Efficiency of a Mining Enterprise by Coordinating Production Processes
1 T.F. Gorbachev Kuzbass State Technical University, Department of Automobile Transportation, 650000 Kemerovo, 28 Vesennya st., Russian Federation
2 Kazakh Humanitarian Juridical Innovative University, EKR, Semey, 11Mangilik st., Republic of Kazakstan
∗ Corresponding author: alexturin07@rambler.ru
To improve the efficiency of the mining industry, it is necessary to coordinate all production processes, which allows reducing unproductive downtime of mining and transport equipment, increasing their productivity, and reducing the cost of operations at all stages of the production cycle. To achieve this result, the article uses a systematic approach to consider the features of planning the work of all departments of the coal mine, starting with drilling and blasting operations on the sites and ending with the shipment of finished products to consumers. Based on the example of JSC “Chernigovets” in the Kemerovo region, the article considers a two-level model for planning the work of all divisions of the enterprise for a month, taking into account the dynamics of resource use of production and transport sections. Taking into account the uneven performance of production operations and the wide variety of mining equipment used at the stages of preparation, excavation, excavation, transportation, processing and shipment of finished products to external rail transport, it is possible to use a hierarchical two-level system with aggregation of processes at the first level and their detail at the second level. Using the dynamic programming method allowed us to solve the problem of planning the activities of all divisions of the enterprise at the first level and identify the boundaries of changes in the planned indicators at the second level, which do not worsen the results achieved at the first level. The proposed method of planning the operation of the mine will allow you to quickly track the achieved indicators, compare them with the planned ones and, if necessary, adjust the work of the enterprise’s divisions in real time to achieve the best performance indicators of the coal mine as a whole.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.