Issue |
E3S Web Conf.
Volume 174, 2020
Vth International Innovative Mining Symposium
|
|
---|---|---|
Article Number | 03021 | |
Number of page(s) | 7 | |
Section | Innovations in Mining Machinery | |
DOI | https://doi.org/10.1051/e3sconf/202017403021 | |
Published online | 18 June 2020 |
Energy Interconnection between Rock Mass Transportation and Destruction of Rear Axles Structural Sections of BelAZ Mining Dump Trucks
1 T.F. Gorbachev Kuzbass State Technical University, 650000, Kemerovo, 28 Vesennya st., Russian Federation
2 Yakut research and design Institute of the diamond mining industry “Yakutniproalmaz”, Republic of Sakha (Yakutia), Mirny, Lenin street, 39, Russia
The paper presents analytical formulae of the transportation en- ergy of blasted rock mass depending on the route slopes. The figures are obtained for mining dump trucks with a carrying capacity of up to 55 tons, from 55 to 130 tons and from 130 to 320 tons. In addition, analytical for- mulae are presented for the total destructive energy of the structural section elements of dump trucks depending on the longitudinal slope of the route. The work uses the parameters of crack-like defects that are formed on the rear axle housing component of BelAZ heavy dump trucks. The energy de- pendences of the transportation and destruction processes for mining trucks of various carrying capacities are given. An energy joint diagram has also been constructed, which allows determining the maximum allowable val- ues of the transportation energy of the rock mass and the destruction of the structural section elements for given route slopes.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.