Procedure of computation and automatic marking of drill hole spacing at excavation of horizontal workings
Ural State Mining University, 620144, 30, Kuibyshev st., Ekaterinburg, Russia
* Corresponding author: maxkononenko111@gmail.com
Contemporary approaches and techniques impacting subsurface penetration performance and penetration rate are studied and analyzed. Two main dimensions are identified, and the works performed during operation were compared. A solution based on implementation of modular architecture of the system with optional connection of modules, performing computations according to various techniques, enabling comparison of calculation results and selection of the most effective option, is proposed. A computational experiment based on real-objects data was conducted. The factors effecting drilling-and-blasting operations were identified during its course. A model designing the optical projections over targeted drill holes is also obtained. The proposed approach is more effective and accurate than manual application of drill hole spacing by paint; in addition, is saves a lot of time required for setting-up. Another highlighted advantage of the developed approach is high quality and accuracy at marking of the drill hole spacing for blasting pattern in accordance with geometrical features of the surfaces, vs. approaches and techniques used at preparation to drilling earlier. Aside from that, a clear trend of consistent improvement and perfection by means of application of intelligent algorithm is observed in this scope.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.