Research on optimization method of primary frequency modulation capability based on different ratios of hydropower
1 Central China Branch of State Grid Corporation, Wuhan, Hubei Province, 430077, China
2 Beijing Kedong Electric Power Control System Co., Ltd., Beijing, Beijing, 100089, China
* Corresponding author’s e-mail: 744757525@qq.com
With the continuous development of China’s cross-regional interconnected power grid, large- capacity and long-distance transmission have become an important feature of China’s power grid. As the transmission capacity of single-return transmission lines continues to increase, the risk of frequency fluctuations increases, making grid operation scheduling more concerned with the performance of the unit’s primary frequency modulation. This paper tests the frequency stability of a power system under different scenarios, in which the proportion of water and thermal power in the system is different. The results represent that a system with a large proportion of hydropower has poorer frequency stability. This paper offers a method of primary frequency modulation, which proposed to improve the frequency stability of the system by increasing the time delay of the hydropower unit’s governor. The results of simulation prove that this method is an available solution to solve the problem of poor system frequency stability when a system has a high ratio of hydropower.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.