Research on Control System of Installation Environment for 500kV Cable Tunnel Joint
Guangzhou Power Supply Bureau, Guangdong Power Grid co.,Ltd., Guangzhou, China
* Wenqing Yang: 545704526@qq.com
The environment in the 500kV cross-linked cable tunnel is bad, which is not conducive to ensuring the joint manufacturing process, and it is easy to cause joint installation defects. A joint installation environmental control system stabilizing the temperature and humidity of the joint installation area and reducing dust particles in the air was designed and developed. A closed space in the joint area was formed by use of sliced inflatable membranes. The integration of refrigeration and air-conditioning technology, air dehumidification technology, air filtration technology and air volume adjustment technology realized temperature, humidity, and cleanliness control of the joint installation area. Stable temperature and humidity, as well as clean air atmosphere can greatly improve the installation quality of high-voltage cable joints in the complex cable tunnel environment, and help reduce the failure rate of joints.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.