Issue |
E3S Web Conf.
Volume 194, 2020
2020 5th International Conference on Advances in Energy and Environment Research (ICAEER 2020)
|
|
---|---|---|
Article Number | 03020 | |
Number of page(s) | 5 | |
Section | Power Engineering and Power Generation Technology | |
DOI | https://doi.org/10.1051/e3sconf/202019403020 | |
Published online | 15 October 2020 |
Optimal Model of Investment Decision for Distribution Network Construction Project
1 State Grid Henan Electric Power Company Economic and Technology Research Institute, Zhengzhou 450000, Henan Province
2 North China Electric Power University, Changping District 102206, Beijing
3 State Grid Henan Electric Power Company, Zhengzhou 450000, Henan Province
* Corresponding author: m15295931235@163.com
In order to meet the requirements of precise investment in the distribution network under the new power reform, this paper proposes an optimization model for the investment decision of the distribution network. With the largest net present value rate and the smallest comprehensive cost of grid operation as the optimization goal, and certain capital constraints as constraints, a distribution network 0-1 programming model is established and solved by LINGO software; the analysis of an example shows that this model can ensure the safety of investment in the distribution network and the precise investment allocation in the distribution network under certain financial constraints.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.