Issue |
E3S Web Conf.
Volume 198, 2020
2020 10th Chinese Geosynthetics Conference & International Symposium on Civil Engineering and Geosynthetics (ISCEG 2020)
|
|
---|---|---|
Article Number | 01019 | |
Number of page(s) | 6 | |
Section | Geosynthetics Applied Design Theory and Method | |
DOI | https://doi.org/10.1051/e3sconf/202019801019 | |
Published online | 26 October 2020 |
Research progress on the preparation of concrete with large amount of iron tailings
1 Northeastern University, Shenyang, Liaoning, China
2 Department of Architecture and Civil Engineering, Shenyang University of Technology, Shenyang, Liaoning, China
Recently, the use of sustainable materials has gained increasing attention and recognition, especially in the construction industry. As the main component of concrete, ordinary Portland cement (OPC) is undoubtedly one of the most commonly used building materials in the world. However, the manufacture of OPC is accompanied by environmental and ecological problems such as the release of carbon dioxide. According to estimates, about 5%-8% of the world think that carbon dioxide emissions come from the OPC industry, so it is urgent to use fly ash, tailings, slag and other industrial solid waste to produce cement instead of ordinary Portland cement.This article summarizes the achievements of the predecessors and outlines the influence of different iron tailings and iron tailings content on the mechanical properties and durability of concrete.
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.