Issue |
E3S Web Conf.
Volume 216, 2020
Rudenko International Conference “Methodological problems in reliability study of large energy systems” (RSES 2020)
|
|
---|---|---|
Article Number | 01002 | |
Number of page(s) | 5 | |
DOI | https://doi.org/10.1051/e3sconf/202021601002 | |
Published online | 14 December 2020 |
Development of technical requirements for generating units of distributed energy resources in the conditions of electric power systems transformation
Energy Research Institute of Russian Academy of Sciences, Nagornaya St., 31, bld. 2, Moscow, Russia
* Corresponding author: ilyushin.pv@mail.ru
The paper describes the prospects for commissioning distributed energy resources (DER) in Russia and considers the historical features, as well as the consequences of structural, qualitative, and quantitative changes in Russia’s UES. The main short and long-term transformational changes, as well as current and future challenges, are described. The main changes in the circuit and operating conditions when integrating DERs into distribution grids in the mass scale are shown. The authors justify the need for making changes in the existing technical requirements for power equipment, relay protection, and automation instruments. Technical requirements for the distributed generation plants and new types of equipment (energy storage systems, devices with power converters, etc.) should be developed. The paper proposes a new approach to the development of the DER-based power distribution schemes considering the specifics of modern generating units and loads. It is noted that solving these issues will ensure reliable DER functioning as part of power systems.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.