Study of the operation of a 110 MW combined-cycle power unit at minimum loads when operating on the wholesale electricity market
1 Kazan State Power Engineering University, 420034, Krasnoselskaya St., 51, Kazan, Russian Federation
2 JSC “Tatenergo” branch “Kazan CHP-2”, 420036, Tatsevskaya St., 11, Kazan, Russian Federation
* Corresponding author: dylankn@ya.ru
Currently, all generating equipment with a capacity of more than 25 MW operates in the wholesale electricity market. The operation of combined cycle gas turbines is complicated by the implementation of daily load schedules. A distinctive feature of the operation of combined-cycle units is the presence of a gas and steam turbine in the cycle. In this paper, the variable operating modes of a combined cycle plant are considered. The minimum effective load of a gas and steam turbine is determined. An example of the real operation of a steam turbine that is included in a combined cycle plant 110 MW power unit at an operating combined heat and power is shown. The optimal minimum load of a combined cycle gas turbine unit has been determined. As a result of the research, the values of high and low pressure steam flow rates, fuel gas consumption, steam and gas turbine power were obtained. Based on the research results, the optimal minimum load of a combined cycle gas turbine unit was found - 40 MW. This load allows the main and auxiliary equipment to work without compromising reliability.
Key words: combined cycle plant / gas turbine unit / plant operating modes / electricity market / power dependence on external conditions / initial parameters
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.