Issue |
E3S Web Conf.
Volume 217, 2020
International Scientific and Practical Conference “Environmental Risks and Safety in Mechanical Engineering” (ERSME-2020)
|
|
---|---|---|
Article Number | 07015 | |
Number of page(s) | 8 | |
Section | Environmental Economics | |
DOI | https://doi.org/10.1051/e3sconf/202021707015 | |
Published online | 14 December 2020 |
Production strategy development for an energy company based on SADT
1 Industrial University of Tyumen, Volodarskogo St., 38, Tyumen, 625000, Russia
2 Samara State Technical University, Molodogvardeyskaya street, 244, Samara, Russia
* Corresponding author: minnullinaay@yandex.ru
The article presents an algorithm for choosing the type of production strategy and its development in a company performed by a formed working group. In order to clearly reflect the relationship between the production strategy under developed and other functional strategies of companies and to eliminate all kinds of errors that many developers encounter at the planning stage, it is proposed to implement SADT. The research demonstrates a breakdown of the original function “Development of the organization’s production strategy” based on the SADT diagram, which describes the input-output transformations and the rules for these transformations. So as to confirm the practical applicability of this tool, it was tested in the energy company OOO Gazspetsstroy. Based on the suggested work plan, the activities for the development of the company’s production strategy are distributed in accordance with the workload of the working group and the complexity of the work performed.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.