Issue |
E3S Web Conf.
Volume 217, 2020
International Scientific and Practical Conference “Environmental Risks and Safety in Mechanical Engineering” (ERSME-2020)
|
|
---|---|---|
Article Number | 11006 | |
Number of page(s) | 15 | |
Section | Regional Environmental Policy | |
DOI | https://doi.org/10.1051/e3sconf/202021711006 | |
Published online | 14 December 2020 |
Application of cluster models in forecasting housing construction economic potential in the region
1 Academy of Civil Engineering and Architecture, Derzhavina str., 2, 286123, Donetsk, Ukraine
2 Sevastopol Institute (Branch) of Plekhanov Russian University of Economics, Vakulenchuka Str., 29-4, Sevastopol, Russia
3 Plekhanov Russian University of Economics, Stremyanny lane, 36, Moscow, 117997, Russia
4 Academy of Civil Engineering and Architecture, Artema str., 138/10, 283110, Donetsk, Ukraine
* Corresponding author: v.g.sevka@donnasa.ru
The article introduces the first econometric modeling of the needs in new housing construction, reconstruction, capital repairs and finishing of uncompleted construction objects in the region on the basis of cluster models. Forecasting diagrams of gaps between the existing economic potential of housing construction and a normative need in sector housing as well as the need in introducing sector housing to reach mean European standards of housing are plotted.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.