Issue |
E3S Web Conf.
Volume 233, 2021
2020 2nd International Academic Exchange Conference on Science and Technology Innovation (IAECST 2020)
|
|
---|---|---|
Article Number | 01094 | |
Number of page(s) | 7 | |
Section | NESEE2020-New Energy Science and Environmental Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202123301094 | |
Published online | 27 January 2021 |
Research on the Establishment of Carbon Emission Management Model Based on the Construction Process-Taking a Stadium for the 2022 Beijing Winter Olympic Games as an Example
1 China Architecture Design & Research Group, Beijing, 100044, China
2 Beijing University of Civil Engineering and Architecture, Beijing 100044, China
* Corresponding author: xubin@cadg.cn
At present, there are few systematic studies on carbon emission management of construction projects, which can no longer meet the requirements of carbon emission management of the construction of stadiums for Winter Olympics. This paper, taking a stadium for Winter Olympics as an example, discusses the boundaries, scenario setting and accounting methods of carbon emissions in the construction process. And then, we construct the management model and management system of carbon emissions. In this case, the monitoring and collection of carbon emissions and carbon emission reduction measures will be promoted to efficiently finalize the carbon emission pipes for the construction of Winter Olympics stadiums. The management model, technical measures and management system of carbon emissions suitable for Winter Olympics stadiums developed in this research can be further studied and widely applied to carbon emission management in the construction process of various public buildings.
© The Authors, published by EDP Sciences 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.