Issue |
E3S Web Conf.
Volume 236, 2021
3rd International Conference on Energy Resources and Sustainable Development (ICERSD 2020)
|
|
---|---|---|
Article Number | 04026 | |
Number of page(s) | 4 | |
Section | Green Technology Innovation and Intelligent Application of Environmental Equipment | |
DOI | https://doi.org/10.1051/e3sconf/202123604026 | |
Published online | 09 February 2021 |
The whole life cycle model of China’s PPP water project: based on IDEF0 approach
Business School, Sichuan University, Chengdu, Sichuan, 610065, People’s Republic of China
* Corresponding author’s e-mail: chenchuan@scu.edu.cn
As a country with a large population and rapid development, the shortage of water resources is a serious challenge facing China. To meet the needs of domestic and industrial water, since the 1990s, China has begun to try to adopt the PPP delivery model in water projects. Compared with the traditional delivery mode, the PPP method includes the characteristics of high investment, many participants and long payback period. In order to better understand PPP, it is very important and meaningful to model the whole process of PPP project. Through literature review and case study, this paper established a whole life cycle model of China’s PPP water project, which is helpful to better analyze and manage the various processes in the PPP water projects, so as to enhance the operational quality of PPP water projects.
© The Authors, published by EDP Sciences 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.