Stress Calculation and Analysis of a 600MW Supercritical Boiler’s Steam-water Separator
1
POWERCHINA Henan Electric Power Engineering Co., Ltd., Zhengzhou, China
2
Shananxi Datang New Energy Power Design Co, Ltd., Xi’an, China
* Corresponding author: whuxhc@163.com
The steam-water separator of a 600MW boiler has been chosen as the research object. By theoretical analysis’s method and finite element analysis, the stress and secure research has been carried out in the steam-water separator as the thick-walled pressure vessel. For its start-up and normal operation of the working process and features and considering the internal pressure load and thermal stress loading conditions, the initiation of separation stress and security analysis have been carried out about the steam-water separator. The primary stress at the continuum of the cylinder structure can be calculated by the formula, and the calculated results are basically in agreement with the simulated graphic results. And the research work provides a theoretical basis for on-line stress monitoring and life assessment.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.