Issue |
E3S Web Conf.
Volume 281, 2021
IV International Scientific Conference “Construction and Architecture: Theory and Practice of Innovative Development” (CATPID-2021 Part 1)
|
|
---|---|---|
Article Number | 01035 | |
Number of page(s) | 7 | |
Section | Structural Mechanics and Structural Theory, Civil and Industrial Construction | |
DOI | https://doi.org/10.1051/e3sconf/202128101035 | |
Published online | 02 July 2021 |
Modern principles of strategic planning for the central part development in Tambov
1 LLC JV Mosstroy, Tambov district, 392551, Tambov Region, Russia
2 Tambov State Technical University, 392000, Tambov, Russia
* Corresponding author: al_bukhaiti@mail.ru
Unfortunately, modern mass construction does not take into account all the influencing factors on buildings, however, considerable experience has been accumulated over the past decades of design, construction and operation. A method of zoning the central part of the city, taking into account the peculiarities of the engineering-geological and hydrogeological structure of the territory, the terrain, the nature of the development and the technical condition of buildings, has been proposed. Significant areas of dilapidated housing have been marked. The concept of strategic planning and the rules for the development of promising areas in the central part of Tambov, taking into account the peculiarities of its structure, have been developed. These recommendations are universal and can be used in the construction of residential quarters in the cities in the European part of Russia and Europe.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.