Issue |
E3S Web Conf.
Volume 285, 2021
International Conference on Advances in Agrobusiness and Biotechnology Research (ABR 2021)
|
|
---|---|---|
Article Number | 07006 | |
Number of page(s) | 5 | |
Section | Agricultural Machinery | |
DOI | https://doi.org/10.1051/e3sconf/202128507006 | |
Published online | 06 July 2021 |
Improving the efficiency of timber sawing process by increasing reliability of attachments for forestry equipment
Lesosibirsk branch of FSBEI of Higher Education ‘Siberian State Technological University of Science and Technology named after Academician M.F. Reshetnev’, 29 Pobedy str., Lesosibirsk, 662543, Russian Federation
* Corresponding author: tiomka_97@mail.ru
The current state of the timber industry complex and the prospects for its further development indicate the need to revise the approach to organizing logging process as a resource-saving, economically and environmentally sound process. Rational nature management and careful use of available forest resources come to the fore. Today, logging machines are an integral part of logging, and technical condition of the equipment of these machines has a direct impact on their productivity, quality of round timber and amount of sawmill waste received. The paper presents a design solution that makes it possible to increase efficiency of forest machines in freezing temperatures, which increases their productivity and the quality of the resulting roundwood by reducing the generated logging waste.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.