Issue |
E3S Web Conf.
Volume 303, 2021
The 10th Anniversary Russian-Chinese Symposium “Clean Coal Technologies: Mining, Processing, Safety, and Ecology” 2021
|
|
---|---|---|
Article Number | 01007 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/e3sconf/202130301007 | |
Published online | 17 September 2021 |
Assessment of the shovel-truck system operation quality at open-pit mines in Kuzbass
1 Kuzbassrazrezugol Coal Company JSC, Kemerovo, Russian Federation
2 T.F. Gorbachev Kuzbass State Technical University, Kemerovo, Russian Federation
* Corresponding author: vyue.ap@kuzstu.ru
Assessment of the shovel-truck system (STS) operation quality is based on the well-known method of non-expert assessment of the quality of mining machines. The methodology is based on the fundamental principles of qualimetry and allows making the assessment of functionally homogeneous machines of different sizes, types and designs based on the functional criterion of the machine, which determines its main purpose. In this work, the quality assessment is made not for a single machine, but for a set of machines, taking into account their interaction. Assessment of the STS operation quality allows us to create a basis for the selection of priority areas for its improvement. The work uses methods of mathematical modeling, data collection and processing, statistics, analysis and synthesis. A comprehensive quality assessment makes it possible to predict the level and select priority areas for improving existing STSs or STSs being projected.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.