Issue |
E3S Web Conf.
Volume 309, 2021
3rd International Conference on Design and Manufacturing Aspects for Sustainable Energy (ICMED-ICMPC 2021)
|
|
---|---|---|
Article Number | 01003 | |
Number of page(s) | 6 | |
DOI | https://doi.org/10.1051/e3sconf/202130901003 | |
Published online | 07 October 2021 |
Impact of Problems Associated with Scheduling and Capacity Planning of a Production Process – An Overview
1 Department of Mechanical Engineering, Covenant University, Ota, 112233, Nigeria.
2 Department of Mechanical and Mechatronics Engineering, Afe Babalola University, Ado Ekiti, 360101, Nigeria
3 Department of Electrical and Electronic Engineering, Covenant University, 112233, Nigeria.
4 Department of Physics, Covenant University, Ota, 112233, Nigeria
5 Department of Computer Science, Covenant University, Ota, 112233, Nigeria
* Corresponding author: ikumapayi.omolayo@abuad.edu.ng
Production is one of the most important activities which guarantee the continued existence of man; however, it comes with its challenges which make it very difficult to meet up the consumer’s demand. In this regard, the system is required by production and manufacturing companies, human resources, and materials to be enhanced by scheduling and planning of production. In addressing this problem of scheduling over a mid-term possibility, material flow and production objectives should be forecast by solving the problems of planning. Only when the production planning problems have been solved then scheduling problems could be addressed. In this work, we relate scheduling with capacity planning in relation to the production of goods and services. Also reviewed the common problems associated with the industry and how they are overcome.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.