Issue |
E3S Web of Conf.
Volume 365, 2023
IV International Scientific Conference “Construction Mechanics, Hydraulics and Water Resources Engineering” (CONMECHYDRO - 2022)
|
|
---|---|---|
Article Number | 03010 | |
Number of page(s) | 8 | |
Section | Hydraulics of Structures, Hydraulic Engineering and Land Reclamation Construction | |
DOI | https://doi.org/10.1051/e3sconf/202336503010 | |
Published online | 30 January 2023 |
Analytical conclusions and proposals for technical condition and effective use of facilities on Tashkent magistral canal
"Tashkent Institute of Irrigation and Agricultural Mechanization Engineers" National Research University, Tashkent, 100000, Uzbekistan
* Corresponding author: kh.khasanov@mail.ru
The socio-economic development of the Tashkent region (Uzbekistan) depends largely on natural resources, especially water resources, as in other regions. One of the canals that supply water to the Tashkent province is the Tashkent magistral canal (TMC). In terms of size, the second of the canals receives water from the left bank of the Chirchik River. The TMC has been 82 years since its start of use. Hydrotechnical facilities on the TMC are typical of the II class. There are many hydrotechnical facilities on the canal: one main structure, four water dampening facilities, two destructive water discharges, four duckers in the canal, 45 water dischargers, one waterfall, seven under-canal duckers, two pipes under the canal, nine aqueducts, nine canal access, thirteen road bridges, one railway bridge, one pedestrian bridge. This article presents the technical condition of the TMC and its hydrotechnical facilities and recommendations developed based on the technical condition. On April 9-13, 2022, field observation work was carried out to study the technical condition of the TMC and hydrotechnical facilities. It reviewed the availability of technical documents of TMC facilities, instructions for their use, information on maintenance of mechanical equipment, working drawings, previous inspection reports, and other materials. In addition, the conclusions of the inspection carried out by the State Inspection "Davsuvkhujalikzorat" and the results of the technical inspections carried out by the employees of the TMC administration and project parameters of water facilities were studied.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.