Construction technology on dismantlement and reconstruction of point supported glass curtain wall for airport terminal building
1
The first construction engineering limited company of China construction third engineering bureau, Wuhan 430040, China
2
School of Urban Construction, Wuhan University of Science and Technology, Wuhan 430065, China
* cx_xu@sina.com
a 360805754@qq.com
b 570142251@qq.com
c 313725084@qq.com
d 755050543@qq.com
e 814684555@qq.com
Based on the corridor channel curtain wall reconstruction project at Wuhan Tianhe airport T2-T3 terminal building, the structural system of point supported glass curtain wall with cable structure 18 years ago was analyzed, the technical difficulties of curtain wall glass panel removal and bearing cable removal were studied, and technical measures for the dismantlement and reconstruction of point supported glass curtain wall with cable structure were reasonably proposed. During the construction process of the dismantlement and reconstruction, the curtain wall structure was dynamically monitored, the deformation of the monitoring points were small, and the construction process was in a safe state. Due to the success in the dismantlement and reconstruction control technology of the point supported glass curtain wall with cable structure in this project, it not only ensured the construction safety, but also improved the construction quality, which could provide a reference for other similar projects.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.