Issue |
E3S Web Conf.
Volume 380, 2023
International Conference “Scientific and Technological Development of the Agro-Industrial Complex for the Purposes of Sustainable Development” (STDAIC-2022)
|
|
---|---|---|
Article Number | 01042 | |
Number of page(s) | 10 | |
DOI | https://doi.org/10.1051/e3sconf/202338001042 | |
Published online | 13 April 2023 |
Possibilities of the design structure matrix for planning and system analysis of complex engineering systems
1 JSC Atomenergoproekt, Department of Scientific and Technological Development, 603006 Nizhny Novgorod, Russian Federation
2 JSC Atomenergoproekt, Department of Scientific and Technological Development, 603006 Nizhny Novgorod, Russian Federation
3 JSC Atomenergoproekt, Budget Control Department, 603006 Nizhny Novgorod, Russian Federation
4 JSC Atomenergoproekt, Department of Scientific and Technological Development, 603006 Nizhny Novgorod, Russian Federation
5 JSC Atomenergoproekt, Department of Scientific and Technological Development, 603006 Nizhny Novgorod, Russian Federation
1 n.leontyev@ase-ec.ru
2 d.samarov@ase-ec.ru
3 v.fevralev@ase-ec.ru
4 nikonova_io@aep.ru
5 r.tyulenev@ase-ec.ru
The concept of complex engineering objects is closely connected with approaches, methods, management tools for such objects. Modern approaches are based on project management, i.e. on the management of a unique, temporary, multidisciplinary and organized effort aimed at obtaining a consistent final result within predetermined requirements and constraints. The article considers one of the promising methods for building and analyzing the dependency structure of a project, allowing the user to model, visualize and analyze dependencies between objects of any system and receive suggestions for improving or synthesizing the system. Such a system can be, for example, the architecture of a product or an engineering design process, as well as, the organization of an enterprise or a market formed as a complex system and often requires a closer study of its structure. The article describes the significance of the method, its advantages and disadvantages. Examples of the method implementation in design and construction, as well as in IT.
Key words: project management / human capital management / DSM / resource planning / agile / hybrid planning
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.