Issue |
E3S Web of Conf.
Volume 384, 2023
Rudenko International Conference “Methodological Problems in Reliability Study of Large Energy Systems” (RSES 2022)
|
|
---|---|---|
Article Number | 01002 | |
Number of page(s) | 4 | |
DOI | https://doi.org/10.1051/e3sconf/202338401002 | |
Published online | 26 April 2023 |
Improving Belarusian energy system reliability in the context of Belarusian NPP commissioning
1 Belenergosetproject RUE, Republic of Belarus
2 STC FGC UES JSC, JIHT RAS, NRU MPEI, Russia
3 STC Energobezopasnost, Russia
* Corresponding author: m.kashin@besp.by
The article presents the results of computational experiments confirming the efficacy of the phase-shifting transformer (PST) as a type of a phase-shifter, which is to be installed at the backbone 750/330 kV substation Belorusskaya, in the repair and post-emergency states of the Belarusian power system, as well as an analysis of technical and economic performance indicators.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.