On the feasibility of using distributed generation to tackle the issue of insufficient transmission capacity of power lines in urban area
1 PJSC Rosseti Moscow region, Department of Electrical Modes, Moscow
2 PJSC Mosenergo, Expertise and Technical Development Service, Moscow
* Corresponding author: gdima512@yandex.ru
Issues related to the use of distributed generation for solving the problem of insufficient grid capacity in Moscow are analyzed. The problem area, where the current load of the power transmission line (TL) does not meet the requirements for the mode parameters is considered. The paper proposes an alternative way of tackling this problem by installing a low-capacity gas power plant (GPP) instead of reconstructing the power grid. Results obtained from this study can be used by electricity distribution companies as guidelines for solving the above problem.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.