Issue |
E3S Web of Conf.
Volume 401, 2023
V International Scientific Conference “Construction Mechanics, Hydraulics and Water Resources Engineering” (CONMECHYDRO - 2023)
|
|
---|---|---|
Article Number | 05070 | |
Number of page(s) | 7 | |
Section | Engineering Materials Science, Intelligent Transport Systems and Transport Logistics | |
DOI | https://doi.org/10.1051/e3sconf/202340105070 | |
Published online | 11 July 2023 |
Production technology and properties of polystyrene concrete on recycled polystyrene
1 Tashkent Chemical-Technological Institute, Tashkent, Uzbekistan
2 Tashkent Institute of Architecture and Civil-Engineering, Tashkent, Uzbekistan
* Corresponding author: lecturer.dubovitskaya@gmail.com
The article deals with the production of polystyrene concrete from recycled polystyrene crushed in a rotary crusher waste from the production of foam packaging. The resulting polystyrene concrete can be attributed to thermal insulation, used for insulation of load-bearing structures of buildings, as well as to structural and thermal insulation, used as a bearing layer of the outer walls of low-rise buildings. The dependence of the thermal conductivity of the sample on the density and strength of polystyrene concrete has been established, and the resistance to shock loads depends not only on the composition but also on the polystyrene concrete hardening accelerator used.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.