Issue |
E3S Web of Conf.
Volume 402, 2023
International Scientific Siberian Transport Forum - TransSiberia 2023
|
|
---|---|---|
Article Number | 07009 | |
Number of page(s) | 7 | |
Section | High-Performance Buildings, Energy Modeling, Heat & Mass Transfer | |
DOI | https://doi.org/10.1051/e3sconf/202340207009 | |
Published online | 19 July 2023 |
Digitalization of technological and design decisions making processes in modern construction
Tyumen Industrial University, 625000 Tyumen, Russia
* Corresponding author: a.copytowa@yandex.ru
The results of the study can expand the implementation field of the “decisions tree” method. This method can be used in the design decision making processes and technological equipment options when choosing construction equipment for the production of earthwork. The study was carried out on the example of the “Voznesensky” Architectural Ensemble? in Tyumen, hereinafter “Voznesensky AE”. Following goals were achieved: options for a traditional approach to determining the need for construction equipment were considered; models and methods of making managerial decisions were analyzed; the method of “decisions tree” was studied, advantages and disadvantages were identified. The “decisions tree” method ia successfully applied in a digital experiment and recommended for real implementation in the development of an algorithm for making design decisions and when choosing options for mechanizing the production of excavation work using the Deductor Academic Studio program at the construction of a real facility. Currently, there are no cases of direct application of the «decision tree» method in the management of projects in the Russian construction industry. There are no published research results to introduce the «decision tree» method in the processes of design and production decisions.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.