Issue |
E3S Web of Conf.
Volume 415, 2023
8th International Conference on Debris Flow Hazard Mitigation (DFHM8)
|
|
---|---|---|
Article Number | 02009 | |
Number of page(s) | 4 | |
Section | Experiments and Modeling | |
DOI | https://doi.org/10.1051/e3sconf/202341502009 | |
Published online | 18 August 2023 |
Pilot study to explain runout distances of debris flow and immature debris flow considering depositing rate
1 National Institute for Land and Infrastructure Management, SABO Department, Tsukuba, Japan
2 CTI Engineering Co., LTD., Tsukuba, Japan
* Corresponding author: izumiyama-h92ta@mlit.go.jp
In Japan, many debris flows and sediment-laden floods cause serious damage to human life and property. Effective measures require high-accuracy reproduction and prediction of runout distance (bed variation reach) via numerical simulations. One possible method to increase the accuracy of numerical simulation results involves reviewing the methods used to evaluate depositing rate for flows that contain many different sizes of sediments. This study performed experiments using an artificial channel and high-speed cameras to identify parameters that govern depositing rate. The channel implemented exhibited a change in slope point; thus, the slope of the upper reach differed from the slope of the lower reach. The experiments showed that the equation representing depositing rate is closely related to flow velocity. Additionally, the equation of depositing rate can be determined if other parameters are consistently considered.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.