Issue |
E3S Web Conf.
Volume 416, 2023
3rd International Conference on Oil & Gas Engineering and Geological Sciences (OGEGS 2023)
|
|
---|---|---|
Article Number | 01035 | |
Number of page(s) | 5 | |
DOI | https://doi.org/10.1051/e3sconf/202341601035 | |
Published online | 10 August 2023 |
Fatigue Analysis of Hybrid Wind Turbine Towers
1 State Grid Fujian Electric Power Research Institute, Fuzhou 350007, China
2 College of Civil Engineering, Fuzhou University, Fuzhou 350108, China
* Corresponding author: zhaoqi_wu@fzu.edu.cn
Fatigue analysis of hybrid wind turbine towers between cut in wind speed and cut out wind speed are demonstrated. Nominal stress method and miner liner accumulated damage theory are adopted. Through the analysis of the results, comparative research on effect of parameters of aspect ratio, height ratio and unequal legs for fatigue properties of hybrid wind turbine towers. The results show that the optimal range of aspect ratio of hybrid towers is 1/6~1/4, the optimal range of height ratio of hybrid towers is 0.60~0.67. Fatigue analysis of hybrid towers, should select the right junction of leeward towers and the S-N curve from EN 1993-1-9.The effect of unequal legs for fatigue properties of hybrid towers can be neglected.
Key words: Wind power generation / Hybrid tower / Fatigue property / Design load spectrum / Finite element analysis
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.