Design of Municipal Sewer Pipe Jacking under Complex Geological Conditions in Plateau Regions
1 Kunming University of Science and Technology Oxbridge College, Kunming 650106, China
2 Yunnan Broadroad Architectural Engineering Design Co. Ltd., Kunming 650106, China
a 345115909@qq.com
b 605934825@qq.com
The drainage and sewage interception project hi Zhaoyang District involved the installation of a DN1000 municipal sewer pipeline with a total length of 1541 m. Considering factors such as geological conditions, pipe diameter, buried depth, groundwater level, as well as the impact of nearby underground and aboveground structures and traffic, the trenchless construction method of pipe jacking was selected for implementation. The pipeline followed the route of Weiba Road, crossed Jinying Avenue, and then proceeded along the Second Ring East Road until it reached the bank of Yaowan River. The project design took into account practical considerations, including the sewer pipe diameter, material selection, pipeline routing, construction of pipe jacking starting shafts, and the design and modification of arriving shafts, in line with the specific engineering requirements.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.