Issue |
E3S Web of Conf.
Volume 458, 2023
International Scientific Conference Energy Management of Municipal Facilities and Environmental Technologies (EMMFT-2023)
|
|
---|---|---|
Article Number | 01022 | |
Number of page(s) | 5 | |
Section | Energy Management, Energy Conversion and Storage | |
DOI | https://doi.org/10.1051/e3sconf/202345801022 | |
Published online | 07 December 2023 |
Thermoelectric properties of silicon oxide
Andijan Machine Building institute, Andijan, Uzbekistan
* Corresponding author: o.lut@mail.ru
The article describes the results obtained from the study of the thermal conductivity of granulated silicon particles covered with a layer of silicon oxide. The results of the study show that the thermal conductivity of granulated silicon increases from λ ~1,12 W/mK to λ ~2,74 W/mK at T~300÷600 K, which is consistent with the results of silicon oxide (λSiO2~1 W/mK). It was also observed that the electrical conductivity changes in the range of σ~0,0038÷0,017 (Ohm·sm)-1. The results of the study were explained based on the formation of a layer of silicon oxide on the surface of granulated silicon particles obtained by powder technology. Temperature-induced thermal voltaic effects are observed in the silicon oxide layer. This process depends on the formation of electron-hole pairs in cases with localized access, which leads to an increase in parameters λ and σ.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.