Issue |
E3S Web Conf.
Volume 471, 2024
XIV International Conference on Transport Infrastructure: Territory Development and Sustainability (TITDS-XIV-2023)
|
|
---|---|---|
Article Number | 05006 | |
Number of page(s) | 8 | |
Section | Transportation Operations and Logistics Dynamics | |
DOI | https://doi.org/10.1051/e3sconf/202447105006 | |
Published online | 04 January 2024 |
Calculation of energy expenses for moving soil by the conveyor of the unit for tunneling
1 Yaroslavl State Technical University, 88 Moscow Avenue, Yaroslavl, 150023, Russia
2 South Ural State Agrarian University, 13 Gagarin Street, Troitsk, 457103, Russia
3 South Ural State University, 76 Lenin Avenue, Chelyabinsk, 457080, Russia
4 Ukhta State Technical University, 13 Pervomayskay Street, Ukhta, Komi Republic, 169000, Russia
5 Saint Petersburg State University of Architecture and Civil Engineering, Saint Petersburg, 190005, Russia
6 Kazan Federal University, 18 Kremlin Street, Kazan, 420008, Russia
7 Ural Federal University named after the First President of Russia B.N. Yeltsin, 19 Mira Street, Yekaterinburg, 620002, Russia
8 Kazan State Power Engineering University, 51 Krasnoselskaya Street, Kazan, Russia
* Corresponding author: emihaylenko@ugtu.net
Russia has a large spatial separation of settlements and other objects. Therefore, the construction of highways using technical means of cyclic action is inefficient. The use of a complex of continuous units will increase the pace of road construction, improve their quality and reduce energy costs. All units of continuous operation are patented in Russia. They allow you to perform the entire complex of road construction works by the flow method. The complex includes a tunneling unit for open and closed excavation, taking into account terrain irregularities. The proposed tunneling unit allows the development of tunnels with a width of 4.3 m and a height of 3.4 m using direct-flow rotary rippers, augers and passive knives. The calculation of the main parameters of the tunneling unit conveyor drive is carried out. The theoretical capacity of the tunneling unit, in the absence of rocky and frozen soil, in terms of the volume of undrafted soil was 1.054 m3/s. As a result of calculations, the total energy costs for moving one cubic meter of soil amounted to 38218 J/m3. The estimated power of the conveyor drive (excluding idling) was 52 kW. The torque of the conveyor drive is 936 Nm.
© The Authors, published by EDP Sciences, 2023
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.