Issue |
E3S Web of Conf.
Volume 479, 2024
International Seminar of Science and Applied Technology: Natural Resources Management for Environmental Sustainability (ISSAT 2023)
|
|
---|---|---|
Article Number | 07023 | |
Number of page(s) | 10 | |
Section | Sustainable Development | |
DOI | https://doi.org/10.1051/e3sconf/202447907023 | |
Published online | 18 January 2024 |
Glycerin Pitch as a partial replacement of pen 60/70 in AC-WC mixture
Department of Civil Engineering, Bandung State Polytechnic, Bandung 40559, Indonesia
* Corresponding author: rini.septiani.mtri22@polban.ac.id
Glycerin pitch is a glycerol refining product from the oleochemical industry with a processing cost of US$ 400/ton. In this research, GP is used as an alternative asphalt material to replace and reduce the use of imported asphalt. GP came from 13 Indonesian oleochemical companies and was categorized based on inorganic content with sample 1 being less than 10% with an optimum GP content of 27% and sample 2 being more than 10% with an optimum GP content of 14.2%. The primary objective of this study was to explore the potential of GP as a substitute for imported asphalt. The test results showed that the optimum asphalt content for GP in sample 1 was 6% which resulted in a density of 2.26 g/cm3, VIM 4.4%, VMA 18.77%, VFB 76.53%, stability 619 kg, flow 2.83 mm, MQ 211 kg/mm. In sample 2, optimum binder content was determined at 6.1%, resulting in density of 2.34 g/cm3, VIM 5%, VMA 15.68%, VFB 68.02%, stability 1092.3 kg, flow 3.45 mm, and MQ 316 mm. The optimized Gp content value of 27% and 14.2% Gp can reduce the amount of asphalt with Marshall test results with the best stability value in sample 2.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.