Issue |
E3S Web Conf.
Volume 520, 2024
4th International Conference on Environment Resources and Energy Engineering (ICEREE 2024)
|
|
---|---|---|
Article Number | 04028 | |
Number of page(s) | 5 | |
Section | Research on Energy Planning and Management and Energy Economy Strategy | |
DOI | https://doi.org/10.1051/e3sconf/202452004028 | |
Published online | 03 May 2024 |
Research on Evaluation Method of Temporary Road Scheme in Mechanized Construction of Transmission Line
Economic and Technological Research Institute of State Grid Fujian Electric Power Co., Ltd, No. 68, Chayuan Road, Chayuan street, Jin’an District, Fuzhou City, Fujian Province
* Corresponding author’s email: 8862585@qq.com
During the construction of overhead transmission lines, it is difficult for construction equipment to arrival the site, and it is difficult to evaluate the optimal approach comprehensively. In this paper, the evaluation of construction temporary road schemes is built, and a multi-dimensional evaluation index system covering the indicators such as technical factors, economy, environment, safety is constructed. The weight of each evaluation index is determined by analytic hierarchy process (AHP), and the comprehensive score of the scheme is obtained, so as to realize the comprehensive ranking of the approach scheme, which can help make decisions of the optimal approach scheme.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.