Issue |
E3S Web Conf.
Volume 533, 2024
XXVII International Scientific Conference on Advance in Civil Engineering “Construction the Formation of Living Environment” (FORM-2024)
|
|
---|---|---|
Article Number | 01007 | |
Number of page(s) | 12 | |
Section | Modern Building Materials | |
DOI | https://doi.org/10.1051/e3sconf/202453301007 | |
Published online | 07 June 2024 |
Manufacturing full-size panels and frame-filings foam concrete by innovating technologies
Kyrgyz Civil Engineering Institute named after. N.Isanov Kyrgyz State Technical University named after. I. Razzakova, 720020, Bishkek, Kyrgyz Republic
* Corresponding author: mamatov-zh@kstu.kg
This paper is devoted to development of a technological line, technological map and technology of production prefabricated large-sized partition panels and frame fillings on the base of a functioning manufacture prefabricated reinforced concrete products workshop. The territory of the Kyrgyz Republic is one of the most seismically active zones in the Central Asian region. More than 6.3 million people live in Kyrgyzstan. At the same time, the population living in the 9-point zone is about 1.0 million people (including 0.2 million people in Bishkek); in the 8-point zone – 5.1 million people, etc. In accordance with current design standards, the use of brick as frame infill above the fifth floor is prohibited. That’s why, there is a need to use alternative lightweight materials. The production of wall panels and frame fillings from foam concrete will significantly reduce the installation time of walls and significantly reduce the seismic load on the building.
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.