Issue |
E3S Web Conf.
Volume 535, 2024
XIII International Scientific and Practical Forum “Environmental Aspects of Sustainability of Construction and Management of Urban Real Estate” (ESCM-2024)
|
|
---|---|---|
Article Number | 06001 | |
Number of page(s) | 8 | |
Section | Ecological Cycle and Rational Use of Resources in Construction and Real Estate | |
DOI | https://doi.org/10.1051/e3sconf/202453506001 | |
Published online | 11 June 2024 |
Method for systemic risk analysis of mining and economic assessment of high-mountain ore deposits in the Kyrgyz Republic
1 International University of Kyrgyzstan, Bishkek, Kyrgyz Republic
2 Kyrgyz-Russian Slavic University named after B. N. Yeltsin, Bishkek, Kyrgyz Republic
3 St. Petersburg State University, St. Petersburg, Russia
* Corresponding author: divorses@mail.ru
The prevailing uncertainties that arise during the development of high-mountain deposits are identified, and a method is given for their subsequent minimization and cost reduction, which makes it possible to more reliably and objectively carry out pre-feasibility studies. The results can serve as an assessment of the planned capital and operating costs, which significantly affects the profitability of the development of high-mountain deposits and risk events.
Key words: mineral deposits / risks / operating costs / feasibility studies of deposits
© The Authors, published by EDP Sciences, 2024
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.